New AVR fitted to 37248

Although not strictly part of the project to return 37248 to 1964 condition, a key part of ‘Project D6948’ involves a general overhaul and reliability improvements where appropriate. To achieve improved electrical reliability, the decision was taken to source and fit a modern electronic AVR (Automatic Voltage Regulator) to ensure a reliable and steady 110 volt supply to the auxiliaries. The new AVR was fitted and tested on Sunday 31st July, with the loco being fired up for the first time in 8 months. Thanks are due to Noel Craigen for his invaluable assistance. click to continue reading

Project D6948 – Boiler room preparation & bodywork repairs update

After many weeks of toil, the two solid steel ballast weights which simulate the weight of the boiler, were craned out of the loco on the 26th June following the removal of two air tanks which obstructed the lift. This has allowed access to the remainder of the floor area which has now been cleaned out and prepared with bituminous paint and prepares the way for the delivery and installation of the new boiler. click to continue reading

Project D6948 – Boiler complete and ready for delivery

Following completion of work by VAS Engineering to recover and refurbish parts from the 3 ex class 37 Clayton steam generators which have been in open storage at Toddington for many years, and the installation of new replacement parts including a new electrical control system, the new Steam Generator for D6948 steamed for the first time in early June. click to continue reading