{"id":1638,"date":"2023-02-24T22:05:05","date_gmt":"2023-02-24T22:05:05","guid":{"rendered":"http:\/\/thegrowlergroup.org.uk\/?p=1638"},"modified":"2023-02-24T22:07:58","modified_gmt":"2023-02-24T22:07:58","slug":"winter-maintenance-update-feb-2023","status":"publish","type":"post","link":"https:\/\/thegrowlergroup.org.uk\/?p=1638","title":{"rendered":"Winter Maintenance Update Feb 2023"},"content":{"rendered":"\n<p>With only a few weeks of the Winter maintenance period to go, loose ends are being tied up to get our locomotives fit for April and the start of the 2023 running season. Most of the work has centred around <strong>D6948<\/strong> after the completion of the repair to the main reservoir air pipe and the maintenance on the bogies. A historic leak in one of the brake cylinders has also been repaired with the removal and replacement of the offending cylinder coupled with some remedial work on the timing chain, which had shown signs of stretching. Finally, the B Exam has been completed and, after an absence of nearly 3 years,  the &#8216;Green Machine&#8217; has been declared fit for traffic (pending a test run).  For its return, <strong>D6948<\/strong> has been allocated the first three turns in April on the 1st (Purple TT, last round trip), 2nd (Pink TT, whole day) and 4th (Purple TT, last round trip). There are also additional turns throughout April &#8211; please check on the group and GWSR social pages for more information. We look forward to seeing some of you at the GWSR to welcome <strong>D6948<\/strong> back into traffic &#8211; usual caveats apply. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"375\" src=\"http:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/Fpq0X2-XoAMQoET-500x375.jpg\" alt=\"\" class=\"wp-image-1639\" srcset=\"https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/Fpq0X2-XoAMQoET-500x375.jpg 500w, https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/Fpq0X2-XoAMQoET-300x225.jpg 300w, https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/Fpq0X2-XoAMQoET-768x576.jpg 768w, https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/Fpq0X2-XoAMQoET.jpg 1080w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><figcaption class=\"wp-element-caption\">After successful completion of her B Exam, D6948 sits over the pit at Toddington MPD on 22\/02\/23. (Courtesy of Kev Jarvis)<\/figcaption><\/figure>\n\n\n\n<p>Although the primary focus has been on <strong>D6948<\/strong>, that doesn&#8217;t mean that <strong>37215<\/strong> has been neglected. Just after the end of the 2022 season, the round buffers on <strong>&#8216;215&#8217;<\/strong> were removed and replaced, temporarily, with a set of oval ones. It had been identified that the round ones had started to show signs of failure and so the decision was taken to remove them and send them for repair. They are due for return imminently and the B Exam will also be completed in the coming weeks. There has also been a small coolant leak identified which, although not causing the loco to be taken out of service, will need rectification in the very near future. Lastly, with its sister returning to the roster, the removal of the two leaky compressors from <strong>37215<\/strong> can be organised, with them being replaced with a pair of overhauled ones that we have in stores. This is a job that has had to be placed on the back burner whilst keeping the loco in service. <\/p>\n\n\n\n<p>Hopefully, it won&#8217;t be long before we have both locos back on the active roster for the first time since 2019!<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"375\" src=\"http:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/323292093_6450594874971352_3208853773589526893_n-500x375.jpg\" alt=\"\" class=\"wp-image-1640\" srcset=\"https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/323292093_6450594874971352_3208853773589526893_n-500x375.jpg 500w, https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/323292093_6450594874971352_3208853773589526893_n-300x225.jpg 300w, https:\/\/thegrowlergroup.org.uk\/wp-content\/uploads\/2023\/02\/323292093_6450594874971352_3208853773589526893_n.jpg 720w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><figcaption class=\"wp-element-caption\">Back at home! D6948 sits back in the Diesel Shed after several months in the David Page shed. 37215 keeps it company on the adjacent road. (Author)<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>With only a few weeks of the Winter maintenance period to go, loose ends are being tied up to get our locomotives fit for April and the start of the 2023 running season. Most of the work has centred around &hellip; <a href=\"https:\/\/thegrowlergroup.org.uk\/?p=1638\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":15,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1638","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1638"}],"version-history":[{"count":5,"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1638\/revisions"}],"predecessor-version":[{"id":1645,"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/1638\/revisions\/1645"}],"wp:attachment":[{"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1638"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1638"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}