{"id":304,"date":"2011-11-06T20:50:54","date_gmt":"2011-11-06T20:50:54","guid":{"rendered":"http:\/\/thegrowlergroup.org.uk\/?p=304"},"modified":"2012-08-23T06:31:18","modified_gmt":"2012-08-23T06:31:18","slug":"37248-steams-for-the-first-time","status":"publish","type":"post","link":"http:\/\/thegrowlergroup.org.uk\/?p=304","title":{"rendered":"37248 steams for the first time"},"content":{"rendered":"<p>Sunday 6th November was a major milestone in the project to restore 37248 to as built condition. Following installation of fuel and water pipework to the boiler together with the necessary electrical connections, a\u00a0successful\u00a0first steaming took place of the boiler in the locomotive. \u00a0The installation of the main steam pipe along the locomotive together with the associated buffer beam steam heat fittings and pipework will follow.<\/p>\n<p>A short video can be seen <a href=\"http:\/\/www.youtube.com\/watch?v=nsm_wQ4rrC0&amp;feature=mfu_in_order&amp;list=UL\">here<\/a><\/p>\n<figure class=\"aligncenter\" aria-describedby=\"figcaption_\" style=\"width: 610px\"><img loading=\"lazy\" decoding=\"async\" class=\"ngg-singlepic ngg-center \" src=\"http:\/\/thegrowlergroup.org.uk\/wp-content\/gallery\/d6948-project\/dsc_1320.jpg\" alt=\"20111106_003\" width=\"600\" height=\"399\" \/><figcaption id=\"figcaption_\">The boiler is run in the locomotive for the first time - easily producing more than enough steam....<\/figcaption><\/figure>\n<figure class=\"aligncenter\" aria-describedby=\"figcaption_\" style=\"width: 610px\"><img loading=\"lazy\" decoding=\"async\" class=\"ngg-singlepic ngg-center \" style=\"font-size: 12px; font-weight: bold; line-height: 18px; text-align: center; background-color: #f1f1f1;\" src=\"http:\/\/thegrowlergroup.org.uk\/wp-content\/gallery\/d6948-project\/dsc_1310.jpg\" alt=\"20111106_002\" width=\"600\" height=\"399\" \/><figcaption id=\"figcaption_\">The boiler demonstrates what it can do..... <\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Sunday 6th November was a major milestone in the project to restore 37248 to as built condition. Following installation of fuel and water pipework to the boiler together with the necessary electrical connections, a\u00a0successful\u00a0first steaming took place of the boiler &hellip; <a href=\"http:\/\/thegrowlergroup.org.uk\/?p=304\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[16],"tags":[],"class_list":["post-304","post","type-post","status-publish","format-standard","hentry","category-project_d6948_blog"],"_links":{"self":[{"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=304"}],"version-history":[{"count":20,"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/304\/revisions"}],"predecessor-version":[{"id":467,"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/304\/revisions\/467"}],"wp:attachment":[{"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=304"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/thegrowlergroup.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}